>>193222,
>>193225,
>>193226,
>>193227,
>>193228,
>>193229,
>>193230,
>>193231,
>>193232,
>>193233,
>>193234,
>>193235,
>>193236,
>>193237,
>>193238,
>>193239,
>>193240,
>>193241,
>>193242,
>>193243,
>>193244,
>>193245,
>>193246,
>>193247,
>>193248,
>>193249,
>>193250,
>>193251,
>>193252,
>>193253,
>>193254,
>>193255,
>>193256,
>>193257,
>>193258,
>>193259,
>>193260,
>>193261,
>>193262,
>>193263,
>>193264,
>>193265,
>>193266,
>>193267,
>>193268,
>>193269,
>>193270,
>>193271,
>>193272,
>>193273,
>>193274,
>>193275,
>>193276,
>>193277,
>>193278,
>>193279,
>>193280,
>>193281,
>>193282,
>>193283,
>>193284,
>>193285,
>>193286,
>>193287,
>>193288,
>>193289,
>>193290,
>>193291,
>>193292,
>>193293,
>>193294,
>>193295,
>>193296,
>>193297,
>>193298,
>>193299,
>>193300,
>>193301,
>>193302,
>>193303,
>>193304,
>>193305,
>>193306,
>>193307,
>>193308,
>>193309,
>>193310,
>>193311,
>>193312,
>>193313,
>>193314,
>>193315,
>>193316,
>>193317,
>>193318,
>>193319,
>>193320,
>>193321,
>>193322,
>>193323,
>>193324,
>>193325,
>>193326,
>>193328The central chillers and boilers that heat and cool the complex are operating years past their engineered service life, leaving the facility vulnerable to catastrophic mechanical failure and rendering basic climate control increasingly unmanageable.
And for 30 years, a failed filtration system has allowed unfiltered Potomac River water to contribute to buildup, corrosion, and additional strain on the center's aging cooling equipment.
The challenges extend to the stages themselves.
Backstage in the opera house, critical theatrical rigging and overhead production systems are decades beyond their intended service life.
An independent engineering report recommended major replacement as far back as 2002, yet much of that equipment remains in use above performers and crews today.
Taken individually, these are major capital projects.
Together, they represent compounding systemic failures that temporary shoring and piecemeal repairs can no longer mitigate.
This is not about demolition.
A planned temporary closure of the main facility is the only path to overhaul these compounding hazards, modernize critical plant and stage technology, and safeguard this national memorial for generations to come.
But a temporary closure does not mean silencing our mission. By activating the reach and expanding off-site artistic, educational, and civic programming, the center will remain vibrant while this essential overhaul is completed.
It also means preparing for a historic grand reopening, delivering a renewed national home for artists, audiences, and future generations.
The work ahead is significant, but so is the opportunity, and lasting stewardship requires action today.
2026-09-15 01:11 PM ET
https://truthsocial.com/@realDonaldTrump/posts/117276165695164918 105