Anonymous
02/23/2025 (Sun) 19:51
No.
11945
del
If a yellow belt carries 15 items per second, and a steel furnace smelts iron in 0.625 seconds, then that equates to 24 furnaces for peak iron production from a single yellow belt.
Am I wrong?